首页> 外国专利> Process for the operation of a brown coal furnace plant and brown coal furnace plant for carrying out the method

Process for the operation of a brown coal furnace plant and brown coal furnace plant for carrying out the method

机译:褐煤熔炉厂的操作方法和实施该方法的褐煤熔炉厂

摘要

The firing system is for a boiler (1) which runs on brown coal. The coal is fed through a pipe (11) into a chute (10) leading to a pulverising mill (9) and the pulverised coal is carried in a stream of recirculated gas to a set of burners firing into a combustion chamber (7). Hot gas (RZ) from the top of the combustion chamber passes through a recirculation line (RG) into the coal chute (10). Further gas is taken from above the boiler tubes (4) through a recirculation line (12) with a control valve (13). It mixes with the gas from the first line. USE/ADVANTAGE - Firing of boiler using brown coal achieves combustion with low NOx emissions.
机译:燃烧系统用于以褐煤运行的锅炉(1)。煤通过管道(11)送入通向粉磨机(9)的溜槽(10)中,粉煤以循环气流的形式输送到一组燃烧器中,并进入燃烧室(7)。来自燃烧室顶部的热气(RZ)通过再循环管线(RG)进入煤槽(10)。另外的气体通过带有控制阀(13)的再循环管线(12)从锅炉管(4)上方吸入。它与来自第一管线的气体混合。使用/优点-使用褐煤燃烧锅炉可实现低NOx排放的燃烧。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号