首页> 外国专利> The high rise building, at the time of general steel-frame constructing, the joint part just is installed, to the wall and the floor the construction method which keeps being completed.

The high rise building, at the time of general steel-frame constructing, the joint part just is installed, to the wall and the floor the construction method which keeps being completed.

机译:高层建筑,在一般钢框架建筑时,接头部分刚刚安装,在墙壁和地板上保持完备的施工方法。

摘要

(57) Abstract (Modified) Objective The high rise building, at the time of generality constructing, with the crane and the like the ironAfter assembling the bone, it makes the generally known molding box, the concrete flowIt does and is packed and makes the wall and the floor but is, as for the labor and time very onesUntil so it is, the concrete dries, whether also time suitable to be long?ru. After the building being completed, problem of the mold and the humidity aWhen the ri, it dries to 2 - 3 years it is required completely even, it is said.When we assume that the wall is produced at the factory, as for making the wall which is dried it is it is easyIt is thing, in addition color is also processing is possible. What compared to steel frameAs for the building being completed mostly with just the assembly operation seriousIt is decrease of cost, the opening of the joint part just remainsWhen so, the steel-frame part is assembled, the wall and the floor keep being completedBecause the case of job it is thought that also foothold stabilizes. Constitution In wall material and flooring such as concrete steel frame and flexible pipeThe skewer it is done. Of course, stiffener such as reinforcing rod you insertHooks this kind of pattern with the crane and the like, joiningThe construction method which the screw and being able to succeed to part with welding, the building etc makes.
机译:(57)<摘要>(修改)<目的>高层建筑,在一般建造时,用起重机等铁组装骨头后,制成众所周知的造型盒,混凝土的流动性是包装和制作墙壁和地板,但至于人工和时间却很长,直到混凝土干燥,时间是否也适合长时间?据说建筑物完工后,会出现霉菌和湿度问题。据说干燥到2-3年时,甚至完全需要干燥。假设墙壁是在工厂生产的,容易干燥的墙是东西,另外颜色也可以加工。与钢架相比什么只需要认真的组装作业就可以完成建筑物成本的降低,接头部的开口就可以保持了这样的情况下,钢架部被组装,墙壁,地板保持完工的情况工作被认为也立足点。 <构成>在混凝土钢制框架和挠性管等墙体材料和地板中进行串烧。当然,插入的加强杆等加劲件用起重机等钩挂这种图案,将螺钉和能够成功地与焊接,建筑物分开的建筑方法制成。

著录项

  • 公开/公告号JPH0744220U

    专利类型

  • 公开/公告日1995-11-07

    原文格式PDF

  • 申请/专利权人 長倉 満衛;

    申请/专利号JP19910080631U

  • 发明设计人 長倉 満衛;寺師 宗典;

    申请日1991-07-01

  • 分类号E04B1/02;E04B1/35;E04G21/14;E04G21/16;

  • 国家 JP

  • 入库时间 2022-08-22 04:30:39

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号