首页>
外国专利>
CONSTRUCTION METHOD FOR JOINT OF OUTER WALL AND INNER WALL TO SHORTEN CONSTRUCTION PERIOD OF STANDARD FLOOR OF BUILDING AND BUILDING CONSTRUCTED BY SAME
CONSTRUCTION METHOD FOR JOINT OF OUTER WALL AND INNER WALL TO SHORTEN CONSTRUCTION PERIOD OF STANDARD FLOOR OF BUILDING AND BUILDING CONSTRUCTED BY SAME
展开▼
机译:相同构造的建筑标准层外墙和内墙对短施工期的连接方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
According to an aspect of the present invention, a construction method for a joint (10) of an outer wall (100) and an inner wall (200) of a standard floor of a building comprises: a first step of forming the inner wall (200) separated from a position where the outer wall (100) is to be formed by a prescribed gap; and a second step of using a connection wall (300) to connect the outer wall (100) and the inner wall (200) after construction of the outer wall (100) and the inner wall (200) is completed. According to the present invention, the outer wall and the inner wall do not interfere with a gang form. Therefore, reinforcing bar work for wall construction can be easily performed, and the reinforcing bar work can start in an early stage regardless of whether the gang form is lifted to shorten a construction period.;COPYRIGHT KIPO 2017
展开▼