首页>
外国专利>
Application manner of branching joint of shield tunnel and temporary partition application device null of branching
Application manner of branching joint of shield tunnel and temporary partition application device null of branching
展开▼
机译:盾构隧道分支接头与临时分区应用装置的应用方式
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To facilitate the implementation by removing a temporary partitioning wall for construction after boring a succeeding shield tunnel from the slant direction to the wall provided at the branch and connection part of a leading shield tunnel to make meet them with each other. CONSTITUTION:A covering body 1 is installed by the assembly of segments according to the boring of a leading tunnel A. A flat plate-like segments are assembled at the connection part and a temporary partitioning board 2 is provided. Backing 3 such as low strength mortar or bubbled styrene is applied to the back of the wall 2, and backing filling 4 is applied thereon. A succeeding tunnel B is bored from the slant direction to the wall 2, and into the outer periphery of meeting part of the tunnels A, B, a supply pipe, freezing pipe 5 are inserted to improve the ground. After the removal of the wall 2, both tunnels A, B are connected. The construction cost can be saved accordingly.
展开▼