首页> 外国专利> Precast sedge hat concrete for steel sheet-pile bulkhead

Precast sedge hat concrete for steel sheet-pile bulkhead

机译:钢板桩舱壁预制草混凝土

摘要

(57) Abstract (Modified) Objective Construction smell of sedge hat concrete of steel sheet-pile wall headLightening field work the te, making use of the precast concreteIt does, compacts process. Constitution In order to enclose the head of the steel sheet-pile wall 4, the underside opensThe sedge hat of the fixed length which it does, possesses the concrete input port in the surfaceContinuing concrete block 1, installation to do to install, sedge hat koThe adjusting fork 3 which is installed inside nkuritoburotsuku and the steel sheet-pileWith after welding, setting sabot 1, from top the conkPlacing to do rito, furthermore according to need the concrete input portThe surface finish which is identical with sedge hat concrete block 1 in 7 is done,It is precast concrete board 2 Inlaying equipment burying it sticks. The so it does,Removing one side of the te and the both sides section, it exposes only reinforcing rod 16,It is sedge hat concrete block 1 '' of making use, application error and curved lineIn the place where thickness of the steel sheet-pile wall exceeds open section 6 for applyingIt makes correspondence possible.
机译:(57)<摘要>(已修改)<目的>钢板桩墙式帽混凝土的建筑气味减轻现场工作,利用预制混凝土做,压实过程。 <构成>为了围封钢板桩墙4的头部,下侧打开它做的固定长度的s草帽,在表面上具有混凝土输入口连续混凝土砌块1,安装做安装,草hat ko安装在nkuritoburotsuku和钢板桩内部的调节叉3在焊接后,将木桶1设置在顶部,用conk放置rito,然后根据需要进行混凝土输入口与莎草帽混凝土块1相同的表面光洁度7完成后,将预制混凝土板2埋入其中的镶嵌设备粘住。这样做,去掉te的一侧和两侧部分,只露出钢筋16,是莎草帽混凝土砌块1英寸,使用误差和曲线在钢板厚度的地方-桩墙超过开放部分6申请它使对应成为可能。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号