(57) Abstract Objective In the opening of the land which forms the entrance of the subterranean hole installationBeing re ru foothold, according to job unnecessary of the aforementioned openingThe part is closed, position of the part which among of the particular openings opensWith those which can change size easily are offered. Constitution It was laid out outside opening 1 the guy dough which opposesOn oru 2, the applying which consists of the channel it transfers material 3Two bodies it laid out parallel. Both it is required and transfers on top between material 3 twoFoothold board 5 was engaged slide possibly. Foothold board 5 is applied, crossing overTo do and make slide vis-a-vis material 3, between both foothold board 5 necessary in jobOpening 1 substantial main point by making the opening W A, smallThe fence it can make easy to do.
展开▼
机译:(57)<摘要> <目的>在形成地下孔设施的入口的土地的开口处,作为立足点,根据上述开口所不需要的工作该部分是闭合的,在特定开口中该部分的位置打开那些可以轻松更改大小的商品。 <构造>在开口1的外面布置了与之相对的家伙面团,在oru 2上,由传送材料的通道组成的应用3平行布置的两个物体。两者都是必需的,并且可能在材料3与顶部的转移之间滑动两个底板5。应用脚踏板5,越过待办事项并在工作中需要的两个脚踏板5之间制作相对于材料3的滑动通过使开口W A Sub>小,可以打开1个基本要点做起来容易。
展开▼