首页> 外国专利> Creation construction method and creation device null of

Creation construction method and creation device null of

机译:的创建构造方法和创建设备

摘要

PURPOSE: To carry out drilling work efficiently and prevent the penetration of underground water or muddy water into a bearing pile under construction and hence form a strong concrete bearing pile. ;CONSTITUTION: A buried inner pipe 3 whose lower end is closed is concentrically inserted into an outer pipe 2 while an excavation blade mounted short pipe 8, which is mounted with an excavation blade 7 whose inner end projects inwardly, is removably connected to the lower end of the outer pipe 2. Both the outer pipe 2 and the inner pipe 3 are driven into the ground at a specified depth while rotating at least the outer pipe 2 and then the excavation blade mounted short pipe 8 is cut off from the outer pipe 2. The outer pipe 2 is pulled up from the underground while the short pipe 8 for the inner pipe and the inner pipe 3 are adapted to remain underground where concrete is filled up in the inner pipe 3.;COPYRIGHT: (C)1994,JPO&Japio
机译:目的:有效地进行钻探工作,防止地下水或泥水渗入正在施工的承重桩,从而形成坚固的混凝土承重桩。 ;构成:下端封闭的埋入式内管3同心插入外管2,而装有挖掘刀片7的内端向内突出的安装有挖掘刀片的短管8可拆卸地连接到下端。在至少旋转外管2的同时,将外管2和内管3都以规定的深度打入地下,然后将安装有挖掘刃的短管8从外管上切下。 2.外管2是从地下拉起的,而内管的短管8和内管3则适合留在地下,在那里内管3中填充了混凝土。版权所有:(C)1994,日本特许厅

著录项

  • 公开/公告号JPH0733667B2

    专利类型

  • 公开/公告日1995-04-12

    原文格式PDF

  • 申请/专利权人 栗本 中富;栗本 雅史;

    申请/专利号JP19920074997

  • 发明设计人 栗本 中富;

    申请日1992-03-31

  • 分类号E02D7/00;E02D7/22;

  • 国家 JP

  • 入库时间 2022-08-22 04:27:34