首页> 外国专利> Engagement structure of employing post

Engagement structure of employing post

机译:招聘岗位参与结构

摘要

(57) Abstract Objective Sinking the head of the foundation pile to the earth, the occasion where it appliesYou employ, join and the disconnection with the post and the foundation pile easily securelyThat try it is possible. Constitution Employing post in joining segment of 1 and foundation pile 20, pin 5As a center, decentering time dynamic body 6 of the form which radius consecutively increasesYou install in bracket 3. This decentering time dynamic body 6 time motionWhen se ru joy stick 9 is provided, joy stick 9 is pulled up on, partialThe heart time dynamic body engages in outside cylindrical surface of the foundation pile, pushes joy stick 9 underThe ge ru and, it releases.
机译:(57)<摘要> <目的>将地基桩的头部沉到地上,适用的场合您可以轻松地牢固地使用,接合和与桩及地基桩的断开连接,这是可能的。 <构造>在1和基础桩20的连接段中使用柱子,以销5为中心,半径连续增加的形式的偏心时间动力体6安装在支架3中。该偏心时间动力体6的时间运动当se摇杆9时提供时,将操纵杆9提起,局部将心脏动力体接合在基桩的外侧圆柱面上,将操纵杆9推入格鲁,使其松开。

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号