首页>
外国专利>
COMPLEX OF STRUCTURES MADE IN SEVERAL PHASES IN REGION OF GROUND WATER OF ROCK MASS UNDER BURIED WASTES AND METHOD FOR MAKING COMPLEX STRUCTURES
COMPLEX OF STRUCTURES MADE IN SEVERAL PHASES IN REGION OF GROUND WATER OF ROCK MASS UNDER BURIED WASTES AND METHOD FOR MAKING COMPLEX STRUCTURES
展开▼
机译:埋入废物下岩体地下水中几个阶段形成的结构复杂性及复杂结构的制作方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: construction. SUBSTANCE: complex of structures includes located under storage - service drift, slot spaces and water-proof layers. Complex has a row of drain holes containing draining pipes. Holes are communicated with day surface, located at acute angle to vertical axis of drift and connected with the latter. Water-proof layer is located around draining pipes. Slot spaces are made under sealing layer. Method for making complex structures includes three phases of construction. Made in the first phase are service drift and draining holes. During the second phase, pressed through draining holes is sealing material into rocks round casings of holes. During the third phase, slot spaces are made and sealing fill is introduced into them. Broken rock resulting from driving slot spaces is taken to the surface through service drift. EFFECT: higher efficiency. 9 cl, 10 dwg
展开▼