首页> 外国专利> The plug and dead water construction method null for dead water construction of leak spring water in the bar hole intermediate

The plug and dead water construction method null for dead water construction of leak spring water in the bar hole intermediate

机译:堵漏水施工方法对酒吧洞中间泄漏泉水的死水施工无效

摘要

PURPOSE: To prevent a drilling edge from being damaged and omit a recovery work to improve working efficiency by using a plug for water cut-off work in which easily cut brush material is wound on a stem fitted to the extreme end of a rod made of easily cut material. CONSTITUTION: A plug 52 wound with brush material 51 of easily cut material on a stem 50 fitted to the extreme end of a water cut-off chemicals injection rod 55 made of a wood, resin, or the like easily cut by a drilling edge is mounted on the rod 55, and it is pushed in the lower position of the leakage water or spring water position of a boring hole 53. Next granular substance 56 capable of being crushed by the drilling edge is thrown down and lockingly piled on a brush material part 51, pessure water is sent to the rod 55 to separate the plug 52, and then water cut-off chemicals (consolidating material) 57 is injected to the granular substance layer 6. A consolidated layer 59 is formed, leakage water or spring water gaps are clogged, the consolidated layer 59 is drilled by a drilling machine to cut off, remove, and open a hole. Hereby, the water cut-off work is set simply and quickly, and the device can be light- weighted and of low price.
机译:用途:为防止钻头损坏,并通过使用堵水塞将可轻松切割的刷子材料缠绕在安装在由杆制成的杆的最末端的阀杆上,以防止钻刃损坏并省略恢复工作以提高工作效率。容易切割的材料。构成:用易于切割的材料制成的刷子材料51将杆52缠绕在阀杆50上,该阀杆安装在由木材,树脂或类似物制成的易水蚀化学品注入杆55的最末端,该杆易于被钻孔边缘切割。将其安装在杆55上,然后将其推入钻孔53的泄漏水的下部位置或弹簧水位置。将下一个能被钻孔边缘压碎的粒状物质56抛下并锁定堆在刷具上在部分51中,将纯净水送至杆55以分离塞子52,然后将防水剂(固结材料)57注入粒状物质层6。形成固结层59,泄漏水或泉水。缝隙被堵塞,固结层59被钻孔机钻孔以切下,移除并开孔。因此,止水工作设置简单,迅速,并且该装置重量轻且价格低廉。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号