首页> 外国专利> METHOD AND PIPE STRUCTURE FOR PLACING SLUDGE ORIGINATED FROM THICK SLUDGE TECHNOLOGY AT COAL-FIRING POWER PLANTS

METHOD AND PIPE STRUCTURE FOR PLACING SLUDGE ORIGINATED FROM THICK SLUDGE TECHNOLOGY AT COAL-FIRING POWER PLANTS

机译:燃煤电厂浓泥产生的淤泥的铺设方法及管材结构

摘要

The settling basin is delineated by an outer dyke, then subdivided by inner dykes into section. Pipelines are routed to these sections, and the slurry is deposited in layers and allowed to harden. - Fresh layers are added when possible. A new feature of the pipelines is that they are of polyester material, with a 5% by volume filling material (power station fly-ash) and in some cases glass fibre reinforcement
机译:沉降池由外堤划出轮廓,然后再由内堤划成部分。将管道引到这些部分,然后将浆液分层沉积并使其硬化。 -尽可能添加新的图层。管道的新功能是它们是聚酯材料,具有5%体积填充的材料(电站粉煤灰),在某些情况下还包括玻璃纤维增​​强材料

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号