首页> 外国专利> BUILDING CONSTRUCTION METHOD OF BUILDING STRUCTURE BODY AND LIFTER OF BUILDING STRUCTURE BODY

BUILDING CONSTRUCTION METHOD OF BUILDING STRUCTURE BODY AND LIFTER OF BUILDING STRUCTURE BODY

机译:建筑结构体的建筑施工方法及建筑结构体的提升

摘要

PROBLEM TO BE SOLVED: To construct a building structure body of a medium-high story having the necessary story number by completing a building frame of the uppermost floor on the first floor, and lifting the completed building frame in order from the uppermost floor. ;SOLUTION: A vertically movable raising-lowering beam 3 is interposed in a stand 1 with its left and right outside wall inside surfaces as a guide, and a screw rod 4 suspended so as to penetrate through a top part is inserted into and screw-fitted to a nut member 5 fixed to a central lower part of the raising-lowering beam 3, and is rotated by a driving motor. A connecting beam 11 is arranged in an upper surface rear part of the raising-lowering beam 3, and the lower end of a main column 2 is supported with this front upper surface, and an adjusting block 19 having a spherical surface seat 18 is provided. Parallel two strip load receiving beams 21 which can perpendicularly advance and retreat to a beam of a building and support an under surface of a beam 20 in the vicinity of both sides of the main column 2, are respectively arranged on the left and right of an upper part of the stand 1, and these are supported on support beams 22 and 23 horizontally arranged in front and rear parts between left and right side walls of the stand 1 so as to be longitudinally movable. A building frame of respective stories reaching the necessary floor from the uppermost floor is completed in order by using this lifter A.;COPYRIGHT: (C)1997,JPO
机译:解决的问题:通过完成第一层的最上层的建筑框架,并从最上层按顺序抬起完成的建筑框架,来构造具有必要故事编号的中高层建筑的建筑主体。 ;解决方案:将可垂直移动的升降梁3插入支架1,并以其左右外壁内表面为导向,并悬挂一根可穿透顶部的螺杆4并将其插入-装配到固定在升降梁3的中央下部的螺母构件5上,并通过驱动马达旋转。升降梁3的上表面后部布置有连接梁11,主柱2的下端由该前上表面支撑,并设有具有球形表面座18的调节块19。 。可以平行于建筑物梁前进和后退并在主柱2的两侧附近支撑梁20的下表面的两个平行的条形受力梁21分别布置在主梁2的两侧。支架1的上部被支撑在支架1的左右侧壁之间的前后部分中的水平方向上可水平移动的支撑梁22和23上。使用此升降机A,按顺序完成从最高层到达所需楼层的各个楼层的建筑框架。;版权:(C)1997,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号