首页> 外国专利> PILING UP STEEL-MADE FRAME OF BRIDGE PIER HOOP TIE AND ASSEMBLING METHOD OF BRIDGE PIER HOOP TIE

PILING UP STEEL-MADE FRAME OF BRIDGE PIER HOOP TIE AND ASSEMBLING METHOD OF BRIDGE PIER HOOP TIE

机译:桥墩箍的钢制框架构架及桥墩箍的组装方法

摘要

PROBLEM TO BE SOLVED: To pile up bridge hoop ties per classification on a steel-made frame and facilitate hanging by slinging and a crane. ;SOLUTION: In a steel-made frame for piling up bridge pier hoop ties which pile up bride pier hoop ties 1 and 2, which are substantially L-shaped and envelop a semicircle area around bridge main reinforcements laid out along each side which forms a substantially rectangular shape, there is provided a frame member 11, which arranges steel materials (angle materials) 12 and 13 in a double cross by twos horizontally and vertically and fixes each other and loads bride pier hoop ties, which are substantially J-shaped, on the top. There are provided reinforcement support members 14 and 16 (support rods by the angle materials), which support from the lateral sides the bridge pier hoop ties 1 and 2, which are erectly provided on a spot to each of both ends symmetrically and piled up on the frame member 11 in the form of substantially J shape.;COPYRIGHT: (C)1997,JPO
机译:要解决的问题:在钢制框架上按类别堆放桥梁箍,并通过吊索和起重机方便悬挂。 ;解决方案:在用于堆叠桥墩箍的钢制框架中,将桥墩箍1和2堆叠成大致L形,并在桥主钢筋周围包裹一个半圆形区域,沿着每侧布置,形成一个在大致矩形的形状中,设置有框架构件11,该框架构件11在水平和垂直方向上以双倍的间隔布置钢材料(角材)12和13,并且彼此固定并加载大致呈J形的新娘箍箍,在顶端。设置有加强支撑构件14和16(由角材制成的支撑杆),其从侧面支撑桥墩箍扎带1和2,其在现场竖立地对称地设置在两端,并堆积在其上。框架构件11基本上呈J形。版权所有:(C)1997,日本特许厅

著录项

  • 公开/公告号JPH0941324A

    专利类型

  • 公开/公告日1997-02-10

    原文格式PDF

  • 申请/专利权人 MAEDA CORP;

    申请/专利号JP19950195252

  • 发明设计人 MORI SEIJI;

    申请日1995-07-31

  • 分类号E01D21/00;E04C5/06;E04C5/18;E04G21/12;

  • 国家 JP

  • 入库时间 2022-08-22 03:30:58

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号