首页> 外国专利> Abutment and pier using composite pile and sheet pile of a bridge, and it's construction method

Abutment and pier using composite pile and sheet pile of a bridge, and it's construction method

机译:利用桥梁的复合桩和板桩的桥台墩及其施工方法

摘要

The present invention is synthesized as a method to form a pile driving, foundation piles and permanent structure to a predetermined depth of a synthetic pile and the steel sheet pile produced by combining the steel sheet pile and the steel pipe pile or H peg to the target soil, which construction the shift and the piers of the bridge stakes and supporting a vertical load and lateral load at the same time, steel sheet pile is in a format that supports the earth pressure steel sheet pile wall is the role of the supporting replace conventional retaining wall and weak vertical bearing capacity of the steel sheet pile is synthesized synthesis stake making structures and and to act as a supporting pile constituting the relief or bridges, to greatly reduce a construction period and provide alternating, bridges, and a method of construction of the bridge using a synthetic pile and the steel sheet pile to reduce the cost by omitting an unnecessary process it is an object.; The invention connects the synthetic pile and the steel sheet pile to the target soil, comprising pile driving; The step of reinforcing the reinforcement to the top of the composite pile and the steel sheet pile and concrete cast-in-place curing to capping; Steps for installing gyojwa device to a predetermined position on the capping concrete; Step of placing the reinforcement and the cured concrete on the capping Concrete superstructure; After the superstructure construction and at the same time clean the exposed surfaces of the composite pile and the steel sheet pile is characterized in that the construction of facilities via a step for applying a predetermined method step.
机译:合成本发明作为将打桩桩,基础桩和永久结构形成到合成桩的预定深度的方法,该合成桩是通过将钢板桩和钢管桩或H桩结合到目标而制成的钢板桩土,同时建造桥墩和桥墩,同时支撑竖向荷载和横向荷载,钢板桩的形式是支撑土压力钢板桩的壁面,是代替传统的支撑作用钢板桩的挡土墙和弱的竖向承载力是由合成的合成桩构成的结构,并作为构成浮雕或桥梁的支撑桩,从而大大减少了工期并提供了交替的桥梁,以及一种建造方法本发明的目的是使用合成桩和钢板桩的桥梁,通过省略不必要的工序来降低成本。本发明将合成桩和钢板桩连接到目标土,包括打桩。在复合桩和钢板桩的顶部加固钢筋的步骤,以及混凝土现浇固化至封顶的步骤;将饺子装置安装到封盖混凝土上预定位置的步骤;将钢筋和固化的混凝土放置在封盖的混凝土上部结构上的步骤;在上层建筑构造之后并且同时清洁复合桩和钢板桩的暴露表面的特征在于,通过用于施加预定方法步骤的步骤来构造设施。

著录项

  • 公开/公告号KR100496735B1

    专利类型

  • 公开/公告日2005-06-22

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030074965

  • 发明设计人 송충호;이성열;

    申请日2003-10-27

  • 分类号E01D19/02;

  • 国家 KR

  • 入库时间 2022-08-21 22:03:41

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号