首页> 外国专利> BURIED FORM UNIT AND CONSTRUCTING METHOD OF DAM EMBANKMENT BODY

BURIED FORM UNIT AND CONSTRUCTING METHOD OF DAM EMBANKMENT BODY

机译:大坝堤岸体的埋设形式单元及构造方法

摘要

PURPOSE: To impart landscape beauty to a dam embankment body, and to save the labor of operation and improve safety by installing a frame body for bearing on the rear side of buried forms by using a connecting jig and placing the lower end face of the frame body for bearing at a position lower than the lower end of the buried forms. ;CONSTITUTION: The surface side of buried forms 1 is formed in appearance having excellent landscape properties harmonizing with natural environment. Channel steel 3 is assembled on the rear side of the buried forms 1 at a regular interval at two upper and lower stages by using connecting Jigs. Frames 6 made of steel are mounted on the buried forms 1 through the channel steel 3, thus constituting a buried form unit A. The vertical height size of the buried forms 1 and the frames 6 made of steel is equalized approximately, and the frames 6 made of steel are displaced downwards and installed at double levels so that connecting surfaces at the lower ends of the frames 6 made of steel are placed at positions lower than the lower end of the buried forms 1. Accordingly, the frames 6 made of steel of the unit A placed at the upper stage of the unit A are consolidated by placing concrete up to the upper end of the unit A, and brought to the state, in which the frames 6 are fixed firmly.;COPYRIGHT: (C)1996,JPO
机译:目的:通过使用连接夹具并放置框架的下端面安装用于支撑埋藏形式背面的框架,为大坝堤防主体赋予景观美感,并节省操作劳动并提高安全性。支撑体,其位置低于埋入式样的下端。 ;组成:掩埋的模板1的表面形成的外观具有与自然环境相协调的出色景观特性。槽钢3通过使用连接夹具以规则的间隔在上,下两个阶段组装在埋入模板1的后侧。由钢制成的框架6通过槽钢3安装在掩埋模板1上,从而构成掩埋模板单元A。掩埋模板1和由钢制成的框架6的垂直高度尺寸大致相等,并且框架6将由钢制成的框架6向下移位并安装在两个高度上,从而将由钢制成的框架6的下端的连接表面放置在低于埋入模板1的下端的位置。通过放置混凝土直到单元A的上端,将放置在单元A上层的单元A固结,并使其处于牢固固定框架6的状态。版权所有:(C)1996,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号