首页> 外国专利> Lifting management manner null on of constructive

Lifting management manner null on of constructive

机译:提升管理方式对建设性无效

摘要

PURPOSE:To properly carry out the process management and lift plan by inputting the lift result into a personal computer arranged on a hoisting machine and displaying the collected lift situation onto a CRT display screen, etc. CONSTITUTION:Each detection value of flat surface load detectors 2 and 2, floor No. detecting sensors 3 and 3, etc., is inputted into personal computers 7 and 7 which are installed individually onto hoisting machines 1 and 1. Further, necessary lift results are inputted through the input device such as keyboard 13, etc. Then, the collected lift results such as lift situation of all the floors, all the construction divisions, and all the tacts are displayed on the output device such as CRT display screens 4.... Further, the lift situation such as the precedence and delay in process, precedence rate, and the excess and shortage of the lift, etc., is displayed on the output device. Further, the lift result such as name of material, name of constructors and lift weight in a specific floor, construction division, and tact are displayed on the output device.
机译:目的:通过将提升结果输入到设置在提升机上的个人计算机中,并将收集的提升情况显示在CRT显示屏等上,以正确执行过程管理和提升计划。构成:每个平面载荷检测器的检测值如图2和图2所示,楼层号检测传感器3和3等被输入到个人计算机7和7中,所述个人计算机7和7被单独地安装在提升机1和1上。此外,必要的升降结果通过诸如键盘13的输入装置被输入。然后,将所收集的电梯结果,例如所有楼层,所有建筑分区和所有节拍的电梯状况显示在输出设备(例如CRT显示屏4)上。在输出设备上显示过程的优先级和延迟,优先级比率以及升降机的过量和不足等。此外,在输出装置上显示诸如材料的名称,建筑商的名称和特定楼层中的电梯重量,建筑分区和间歇等的电梯结果。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号