首页> 外国专利> Management manner null of the installation distance in the lift rise construction method

Management manner null of the installation distance in the lift rise construction method

机译:电梯施工方法中安装距离的管理方式作废

摘要

PURPOSE:To facilitate mounting by separating a jack from a timbering in a state to hold two end parts so that the member of an end part on the slide side is horizontally stretched under gravity and setting the length of a beam to a value within the allowable range of the mounting distance between support structures. CONSTITUTION:A stretch chord beam 3 comprises an arch-shaped large beams material 3a, a stretch chord material 3b, e.g. a strand rope, and a rodform strut material 3C. A beam 3 is assembled on a ground between support structures 1, and a jack 4a at the upper part of a timbering 4 is lowered to separate the jack away from the beam material 3a. The two end parts of the beam material 3a are transferred to support by support devices 7 and 9 through temporarily located auxiliary end members 6 and 8, and the member 8 of an end part on the slide side is stretched over a slide material 9a of a device 9 under gravity of the beam material 3a. After it is confirmed that the length of the beam 3 is within the allowable range of a given mounting distance between structures 1, the beam 3 is mounted on a support truss 2.
机译:目的:为便于安装,在状态下将千斤顶与木料分开以固定两个端部,从而使滑动侧端部的构件在重力作用下水平拉伸,并将梁的长度设置为允许范围内的值支撑结构之间的安装距离范围。组成:拉伸弦梁3包括拱形大梁材料3a,拉伸弦材料3b,例如股绳和杆状支撑材料3C。梁3被组装在支撑结构1之间的地面上,并且在木材4的上部的起重器4a下降以使起重器与梁材料3a分开。横梁材料3a的两个端部通过临时定位的辅助端部构件6和8被支撑装置7和9传递以支撑,并且滑动侧的端部的构件8被拉伸到滑动构件9a的滑动材料9a上。装置9在梁材料3a的重力作用下。在确认梁3的长度在结构1之间的给定安装距离的允许范围内之后,将梁3安装在支撑桁架2上。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号