首页> 外国专利> Weathered dam wall repair - by wall hole drilling to take heavy-load anchors and protective plate support anchors all concreted into place after plate welding in-situ

Weathered dam wall repair - by wall hole drilling to take heavy-load anchors and protective plate support anchors all concreted into place after plate welding in-situ

机译:风化的大坝墙体修复-通过在墙板上钻孔来获取重载锚和保护性板支撑锚,这些锚固件和锚板在原位焊接后均已浇铸到位

摘要

A pattern of holes (12) is drilled into weathered concrete of the pre-treated exterior (6) of the dam (13) so that heavy-load anchors acting as connectors (14) placed in the holes can mount the reinforcement (15). Protective concrete plates (5) are secured at pre-set distance from the dam surface (6) so the interval between them can be poured with concrete to anchor the reinforcement in place. Dam exterior pre-treatment is by sandblasting followed by sealing and each anchor (14) has it own supporting anchor (20) held in the hole (12) by means of a heavy-load dowel (21). The reinforcement is preferably welded to the anchors (14) and perforated rails (25) are used to secure the support anchors (27) for the protective plates (5) as welded to them (27). A plate anchor is screwed onto the free threaded end of the support anchor concerned, the plates (5) being pre-welded to the plate anchors, leaving the plate anchor parts proud of the plates to be cut off after the welding operation.
机译:在大坝(13)的预处理外墙(6)的风化混凝土中钻出一定数量的孔(12),以便用作放置在孔中的连接器(14)的重锚可以安装钢筋(15) 。保护性混凝土板(5)固定在距坝表面(6)的预设距离处,因此可以用混凝土浇筑它们之间的间隔,以将钢筋固定到位。大坝的外部预处理是喷砂,然后进行密封,每个锚栓(14)都有自己的支撑锚栓(20),该支撑锚栓(20)通过重负荷销钉(21)固定在孔(12)中。加强件优选地被焊接到锚定件(14),并且穿孔的轨道(25)被用于在焊接到支撑板(5)时固定用于保护板(5)的支撑锚定件(27)。将板锚固定在相关支撑锚的自由螺纹端上,将板(5)预焊接到板锚上,使板锚部分以待焊接的钢板切断。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号