首页> 外国专利> Sealing working surface during formation of hollow space in tunnel and pipeline construction

Sealing working surface during formation of hollow space in tunnel and pipeline construction

机译:隧道和管道施工中空洞形成时的工作面密封

摘要

Fluid is fed to the earth pressure chamber and the working surface (7) is wetted with the fluid and/or the earth-fluid mixt. The working surface is attacked with high pressure water jets, possibly with the addition of additives, is wetted and penetrated. Fine particles are loosened, broken down and applied to the working surface in a sealing soil-water suspension. Flow passages in the form of gaps and similar are sealed against water loss. The high pressure nozzle jets (9) are directed axis-parallel to the advance shield (1), partic. horizontally, on to the working surface. In addition to emitting fresh water, the jets are directed into the pressure chamber between the working surface and the advance shield.
机译:流体被送入土压力室,工作表面(7)被流体和/或土液混合物润湿。高压喷水作用于工作表面,并可能添加添加剂,使其浸湿并渗透。细颗粒被疏松,分解并在密封的土壤-水悬浮液中施加到工作表面。间隙和类似形式的流道被密封以防止水流失。高压喷嘴射流(9)轴向平行于前进护罩(1)定向。水平地放在工作表面上。除了释放淡水外,这些射流还被引导到工作表面和前挡板之间的压力腔中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号