首页>
外国专利>
JOINED BUILDING CONSTRUCTION BETWEEN REINFORCED CONCRETE COLUMN AND STEEL FRAME BEAM AND ITS JOINED PART STRUCTURE, AND PRECAST REINFORCED CONCRETE COLUMN
JOINED BUILDING CONSTRUCTION BETWEEN REINFORCED CONCRETE COLUMN AND STEEL FRAME BEAM AND ITS JOINED PART STRUCTURE, AND PRECAST REINFORCED CONCRETE COLUMN
PROBLEM TO BE SOLVED: To provide a building construction method where a joined part between a RC-made column and a S beam can be simply joined in a short work term using a through type long fastening bolt. ;SOLUTION: A beam joining steel pipe 3 which has a height enough to join a S beam 2 and a bolt hole 4 about similar to the sectional shape of a RC-made column 1 is formed, and the long unbonded fastening bolt 5 is inserted through the bolt hole 4 and piercedly provided in the beam joining steel pipe 3. The beam joining steel pipe 3 is arranged in the joined part of the column 1, and a column reinforcement is arranged around the column 1, and column forms are assembled, and concrete is placed in them for forming the RC-made column 1. A joining plate 7 with a bolt hole 8 is provided in the end of the S beam 2, which is set up between the RC-made columns 1, 1, and the long fastening bolt 5 is inserted through the bolt hole 8 of the joining plate 7 and fastened with a nut 9 on the joining plate 7.;COPYRIGHT: (C)1998,JPO
展开▼