首页> 外国专利> OPERATION CONTROLLER OF RAILWAY ROLLING STOCK

OPERATION CONTROLLER OF RAILWAY ROLLING STOCK

机译:铁路轧制作业控制器

摘要

PROBLEM TO BE SOLVED: To control a train interval within a station yard by arranging train position detectors on a rail within the station yard so as to surround sections such as switches and platform trucks, in which the existence of a train is required to be confirmed for security and using exact train position detection information from these detectors. ;SOLUTION: A station has platforms H1 to H3 where a train passes or stops. Detectors D1 to D18 installed on the ground output binary signals of OCCUPY when a train exists on the detectors D1 to D18 and CLEAR when the train does not exist. Switches P1 to P4 input fixed position/reverse position control instructions, switch according to the control instructions and output switch state information on fixed position/reverse position. Each of the detectors D1 to D18 is installed in a shape surrounding switches P1 to P4 or platforms H1 to H3. For instance, the detectors D1 to D4, the detectors D8 to D12 and the detectors D13 to D14 surround the switch P1, switches P3 and P4 and the platform H1, respectively.;COPYRIGHT: (C)1998,JPO
机译:解决的问题:通过在站场内的轨道上布置火车位置检测器,以便围绕诸如开关和平台车等需要确认火车存在的区域,来控制站场内的火车间隔。为安全起见,并使用来自这些检测器的准确火车位置检测信息。 ;解决方案:车站的列车从H1到H3停靠或停靠。当火车上存在火车时,安装在地面上的探测器D1到D18输出OCCUPY的二进制信号;当火车不存在时,探测器D1到D18输出CLEAR。开关P1至P4输入固定位置/反向位置控制指令,根据控制指令进行切换,并输出固定位置/反向位置的开关状态信息。检测器D1至D18中的每个以围绕开关P1至P4或平台H1至H3的形状安装。例如,检测器D1至D4,检测器D8至D12和检测器D13至D14分别围绕开关P1,开关P3和P4以及平台H1 。;版权:(C)1998,JPO

著录项

  • 公开/公告号JPH10264816A

    专利类型

  • 公开/公告日1998-10-06

    原文格式PDF

  • 申请/专利权人 MITSUBISHI ELECTRIC CORP;

    申请/专利号JP19970075994

  • 发明设计人 ASUKA AKIRA;

    申请日1997-03-27

  • 分类号B61L23/14;B60L15/40;

  • 国家 JP

  • 入库时间 2022-08-22 03:06:26

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号