CAST-IN-PLACE STEEL ENCASED REINFORCED CONCRETE PILE RESISTING AND COMPRESSIVE FORCE AND CONSTRUCTING METHOD THEREOF

机译:现浇钢筋混凝土桩的抗压及受力方法

摘要

PROBLEM TO BE SOLVED: To increase the horizontal strength of a pile, and to prevent the cracks of pile-body concrete by constructing the cast-in-place concrete pile of reinforced concrete and introducing prestress by utilizing a steel frame between a front bearing section and a head-section bearing disk. ;SOLUTION: Jigs for introducing prestress and jacks are installed to the head-section bearing disk 11 of the upper end face section of a steel encased reinforced concrete construction and an exposed section in the upper section of a pile body of a steel frame 6 after placed concrete 5 displays specified strength, and prestress is introduced to the pile body between the head-section bearing section 11 and a front bearing section 4 by these jigs and jacks. A footing beam 15 is built at the upper end section of the pile body 5. Accordingly, the steel frame 6 such as a permanent structural column is arranged in approximately overall length in the axial direction of the central section of the reinforced-concrete constructed pile body 5, and the cast-in-place SRC pile resisting drawing and compressive force is built.;COPYRIGHT: (C)1998,JPO
机译:解决的问题:通过构建钢筋混凝土的现浇混凝土桩并通过在前轴承段之间使用钢框架引入预应力,来增加桩的水平强度并防止桩身混凝土的裂缝和头部轴承盘。 ;解决方案:将用于引入预应力的夹具和千斤顶安装在钢包钢筋混凝土结构的上端面部分的头部支承盘11和钢架6桩身上部的裸露部分中。放置的混凝土5显示出特定的强度,并且通过这些夹具和千斤顶将预应力引入到头部支承部分11和前支承部分4之间的桩体中。在桩主体5的上端部段上架设立柱15。因此,在永久性结构柱等钢制框架6上,在钢筋混凝土桩的中央部的轴向大致全长上配置。主体5,并建造了抗拉抗压现浇SRC桩。版权所有:(C)1998,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号