Dam dam body construction construction method
Dam dam body construction construction method
展开▼
机译:大坝坝体施工施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: To shorten the term of work, and to reduce the cost of construction. ;CONSTITUTION: A large number of concrete blocks 11, 12 having a specified shape are prepared, the concrete blocks 11, 12 are stacked, and the surface wall of the embankment body T of a dam is constructed. A space S on the insides of the stacked concrete blocks 11, 12 is filled with aggregate 40, and the concrete blocks 11, 12 and the aggregate 40 are unified by solidifying the aggregate 40, thus building the embankment body T.;COPYRIGHT: (C)1993,JPO&Japio