首页> 外国专利> Ardently beam by the synthetic steel-frame beam combined use underground construction method

Ardently beam by the synthetic steel-frame beam combined use underground construction method

机译:由合成钢框架梁联合利用地下施工法

摘要

PURPOSE:To make the lift-down work of each steel beam easier as well as simplify the construction work by using steel beams for the first stair and underground stair floors in which the ends of the adjacent beams are connected with each other by winding around structural straight columns with them. CONSTITUTION:Structural straight columns 3 are wound with beam ends 4a and 4'a to form a corner bracing, where steel beams 4 and 4' for the first stair and underground stair floors are built connectedly to each other. After the primary excavation, the beam 4 is lowered to a given position under the guidance of the columns 3 and temporarily supported on the columns 3, and the beams 4' are temporarily set under the beam 4. The secondary excavation is made by using the beam 4 as a shore strut, and the beam 4' is lowered to a given position and set on the columns 3 to use it as a shore strut. The same operations are repeated for construction until the lowest stair, and concrete is orderly placed from the lower stairs to construct an underground structure.
机译:目的:通过将钢梁用于第一层楼梯和地下楼梯地板,使相邻的钢梁的末端通过缠绕结构相互连接,从而使每个钢梁的吊装工作更容易并简化施工工作与他们直列。组成:结构直柱3缠绕有梁端4a和4'a,以形成角撑,其中,用于第一层楼梯和地下楼梯的钢梁4和4'相互连接。初步开挖后,梁4在立柱3的引导下下降到给定位置,并暂时支撑在立柱3上,梁4'暂时置于梁4的下方。将梁4作为支撑支柱,并将梁4'降低到给定位置并设置在立柱3上以将其用作支撑支柱。重复进行相同的操作直到最低的楼梯,然后从较低的楼梯有序地浇筑混凝土以建造地下结构。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号