首页> 外国专利> The manner null which constructs the construction large space on the great depth underground

The manner null which constructs the construction large space on the great depth underground

机译:在地下大深度构造施工大空间的方式无效。

摘要

PURPOSE:To construct a building large space to a large-depth under-ground section by building a pile drift from a large-depth shaft, excavating the inside of a spiral shield-tunnel outer circumferential wall body circumferibing to the pile drift and conducting travelling in the internal building bodies of multi- stories. CONSTITUTION:A shaft 1 in depth sufficiently reaching to the building large space of an underground section is constructed, and a pile drift 2 is built in the horizontal direction from a position on its midway of the shaft 1. A shield machine is started from the position on its midway of the shaft 1, a spiral shield tunnel 3 circumscribing to the pile drift 2 is constructed while adjacent shield tunnels 3, 3 are bound mutually, and the insides of the cross sections of the shield tunnels 3 are filled with a reinforcing material 10, thus building an outer circumferential wall body 4. The ground 5 of the internal section of the outer circumferential wall body 4 is excavated, and a large cavity 6 is formed. An internal building body 9 is constructed on rails 7 installed on the floor section of the large cavity 6, and moved. Accordingly, the building large space can be constructed.
机译:用途:通过从大深度竖井建造桩巷,挖掘环绕桩巷的螺旋形盾构隧道外圆周墙体的内部,并进行行进,从而在大深度地下部分中建造建筑物大空间在多层的内部建筑主体中。构成:构造了深度足以到达地下部分的建筑物的竖井1,并从竖井1的中点位置沿水平方向建造了一个排桩2。在竖井1的中途位置上,在相邻的屏蔽通道3、3相互结合的同时,构造了与堆放物2外接的螺旋形屏蔽通道3,并且屏蔽通道3的横截面内部填充有增强材料。材料10,从而构成外周壁体4。在外周壁体4的内部的地面5上开挖,形成大的空腔6。内部建筑体9构造在安装在大空腔6的地板部分上的轨道7上并移动。因此,可以建造建筑物较大的空间。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号