首页>
外国专利>
Equipment pipe connection structure of the unit Room
Equipment pipe connection structure of the unit Room
展开▼
机译:机房设备管道连接结构
展开▼
页面导航
摘要
著录项
相似文献
摘要
(57) Abstract Objective The work due to the unnatural attitude with the high ground is done, necessaryThere is no main point, either difficult job such as registration does not need guttation simplyJoint of the tube is done. Constitution Floor panel 16 of unit room 12 of 2nd floorThe drainpipe inside unit room 10 of the 38th it penetrates completely and 1 floorIn top and bottom direction distribution facilities yu which joints with the top of the drainpipe 36 which is doneIn the drainpipe joint structure of the knit room, yu of the aforementioned 1 floorsThe drainpipe 36 top of knit room 10 sides is configurated briefly,Drainpipe 38 bottom 40 of unit room 12 sides of aforementioned 2 floorsThis drainpipe 38 bottom unit room 1 of 40th and 1 floorThe drainpipe of the center which is briefer than with the drainpipe 36 top 46 of 0 sidesInserting to joint 48, the bottom of drainpipe 48 of aforementioned center and,Drainpipe 36 top 46 of unit room 10 sides of aforementioned 1 floorsWith, at drainpipe 50 of bellows condition you joint.
展开▼