首页> 外国专利> METODE PENGGILASAN LAJUR DAN PELAT SERTA JALUR PENGGILASAN TEMPAT PELAKSANAAN METODE TERSEBUT

METODE PENGGILASAN LAJUR DAN PELAT SERTA JALUR PENGGILASAN TEMPAT PELAKSANAAN METODE TERSEBUT

机译:铣削和板的方法以及实现该方法的路线的注意事项

摘要

rolling method for steel sheet and strip, starting from thin slabs in a continuous castingin the cast product is subjected to at least one spalling followed by a roughing and finishing before being wrapped around a reel.by a continuous casting machine in two lines (11th,11b) parallel casting thin slab continuous coming at the same time and the thin slabs being cut to obtain footage of measurement requiredthe segments and subsequently subjected to a first stage of spalling, and these segments are accelerated inside for reheating furnaces (18a.18b) modules and to establish a system of translation and transfer (20) cooperating with the mobile terminal modules (19a, 19b) of parallel reheating furnaces (18a, 18b).act by positioning with a sequence alternating these modules terminals (19a, 19b) axially in line with the roughing and finishing.then the segments are alternately pass through a second group of spalling (21) and then through a cage of roughing (22).before being switched to a tunnel furnace (24), a third group scagliatore (27) and the rollers (12).rolling mill for steel sheet and strip including at least a continuous casting machine, a shear (15a, 15), a reheating furnace, a second group of spalling (21).a cage of roughing (22), a tunnel furnace (24), a third group of spalling (27) and a finishing mill (12) followed by a cooling zone (25) and groups want (26).the continuous casting machine of the type having two lines of casting (11th,11b) fed at the same time by a single system for ladle (14) simultaneously with both systems cooperating to mould (13a, 13b), each line of the cast (11th, 11b) by,downstream of the cutters to measure on (15th, 15), the first groups of spalling (17a, 17b) of the rotary type with water at high pressure, every system in reheating furnace (18a.18b) being structured into modules (19) of which at least the respective modules terminals (19a19b) are mobile during the rolling cycle, and associated with a system of translation and transfer (20) act to place in alternately, in the process of rolling cycle.these modules terminals (19a, 19b) in axis with the roughing mill (22) and the finishing train (12).
机译:从薄板坯开始以连续铸造的方式对钢板和钢带进行轧制,然后对铸件进行至少一次剥落处理,然后进行粗加工和精加工,然后通过连续铸造机分两行(11th, 11b)同时连续浇铸薄板坯,并切割薄板以获得所需的尺码片段,然后对其进行第一阶段的剥落处理,并在内部将这些片段加速以进行加热炉(18a.18b)模块并建立与平行加热炉(18a,18b)的移动终端模块(19a,19b)配合的平移和传输系统(20)。然后将线段交替穿过第二组剥落(21),然后穿过粗糙的笼子(22)。 l炉(24),第三组滑车(27)和辊(12)。钢板和钢带轧机,至少包括连铸机,剪切机(15a,15),再加热炉,第二组剥落(21)的机架,粗轧机笼(22),隧道式炉(24),第三组剥落(27)和精轧机(12),其后是冷却区(25)和要轧制的组(26)该类型的连续铸造机具有两个浇铸线(11th,11b),该浇铸线由一个用于钢包(14)的单一系统同时供料,同时两个系统都与铸模(13a,13b)配合,铸件的每条线(11th,11b)通过在(15th,15)上测量的切刀下游,在高压水的作用下,旋转型的第一组剥落(17a,17b)在加热炉(18a.18b)中的每个系统中被构造成模块(19),其中至少各个模块终端(19a19b)在滚动周期中是可移动的,并且与翻译和传输系统( 20)在轧制循环过程中交替地放置。这些模块端子(19a,19b)与粗轧机(22)和精轧机列(12)同轴。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号