首页> 外国专利> METHOD FOR CONSTRUCTION OF NEW DEEP TUNNEL SECTIONS BETWEEN TWO METRO STATIONS AFTER EMERGENCY BREAKDOWN OF OLD SECTIONS

METHOD FOR CONSTRUCTION OF NEW DEEP TUNNEL SECTIONS BETWEEN TWO METRO STATIONS AFTER EMERGENCY BREAKDOWN OF OLD SECTIONS

机译:旧路段紧急停车后在两个地铁站之间新建新的深孔路段的方法

摘要

FIELD: tunneling technology. SUBSTANCE: according to method, new tunnel sections are constructed by lowering from first station below thalweg of wash-out. Longitudinal axis of new tunnel, right-hand as viewed forward from first station, is located over entire length in common vertical plane with longitudinal axis of old right-hand track. Then, distance is assigned for inscribing two normal curves: circular curve for conjugation of longitudinal profile components, and transitional curve in plan from beginning of second station platform to second vertical plane which is normal to first vertical plane. Separated on line of crossing these planes is vertical line which connects two points: one lower point referring to axis of new right-hand track, and one upper point related to axis of existing right-hand station track. Horizontal normal in second vertical plane is limited by center of circular curve which is standard for railway track of given radius. Drawn from lower point of vertical line is axis of new right-hand track with same radius over right-hand single-turn spiral to upper point of vertical line for connection with right-hand second station track. Intermediate component of longitudinal profile is laid from end of standard component of longitudinal profile at minimal downgrade which connects components of downgrade and upgrade to beginning of single-turn spiral to combine into common downgrade determining minimal steepness of spiral upraise. New left-hand tunnel is constructed in parallel to axis of right-hand tunnel on straight runs and concentric to it on curved sections over width of track spacing which is equal to track spacing at second station. EFFECT: high efficiency. 2 dwg
机译:领域:隧道技术。实质:根据方法,新隧道段是通过从冲洗站下方的第一站降下而建造的。从第一站向前看时,新隧道的纵轴位于右侧,与旧的右旋轨道的纵轴位于整个垂直平面的整个长度上。然后,分配距离以刻出两条法线:用于弯曲纵向轮廓分量的圆形曲线,以及从第二工位平台开始到垂直于第一垂直平面的第二垂直平面的平面过渡曲线。在与这些平面相交的线上分开的是一条垂直线,该垂直线连接了两个点:一个较低的点是指新的右手轨迹的轴,而另一个较高的点是与现有右手轨迹的轴有关的。第二个垂直平面中的水平法线受到圆弧中心的限制,这是给定半径的铁路轨道的标准。从垂直线的下点绘制的是新的右侧轨道的轴线,该半径在右手单匝螺旋上的半径相同,一直到垂直线的上点,以与右侧第二站轨道连接。纵向轮廓的中间分量从最小降级的纵向轮廓的标准分量的末端开始,该降级将降级和升级的分量连接到单匝螺旋的开始,以合并为共同的降级,从而确定螺旋上升的最小陡度。新的左手隧道在直线路段上平行于右手隧道的轴线建造,并在整个轨道间距宽度等于第二站的轨道间距的弯曲部分上与之同心。效果:高效率。 2 dwg

著录项

  • 公开/公告号RU2105882C1

    专利类型

  • 公开/公告日1998-02-27

    原文格式PDF

  • 申请/专利权人 RJUMIN VLADIMIR MIKHAJLOVICH;

    申请/专利号RU19960102238

  • 发明设计人 RJUMIN VLADIMIR MIKHAJLOVICH;

    申请日1996-02-06

  • 分类号E21D9/14;E02D29/00;

  • 国家 RU

  • 入库时间 2022-08-22 02:45:13