and value of decrease of ground temperature at depth of 10 m is determined by formula &Dgr;t= -52/T, where T is number of degree-months of positive temperatures in summer period: T=, where t1 is average monthly positive temperature of outdoor air; n i number of months with positive temperature in summer; hn is full height of embankment. EFFECT: provision of immediate decrease of temperature of base grounds with winter-spring construction of embankment with frozen ground. 2 dwg"/> METHOD FOR CONSTRUCTION OF APPROACH EMBANKMENT TO BRIDGE PIERS ON PERMAFROST GROUNDS
首页> 外国专利> METHOD FOR CONSTRUCTION OF APPROACH EMBANKMENT TO BRIDGE PIERS ON PERMAFROST GROUNDS

METHOD FOR CONSTRUCTION OF APPROACH EMBANKMENT TO BRIDGE PIERS ON PERMAFROST GROUNDS

机译:多年冻土地面上桥墩路堤施工方法

摘要

FIELD: construction; may be used in construction of road embankments in permafrost regions. SUBSTANCE: method consists in that in spring period of the year, a platform is filled with rock or coarse-grained dry frozen ground onto natural base cleaned of snow. Laid on filled layer of ground is calculated layer of compacted snow or ice, and covered with a layer of dry frozen ground. Height of ground fill is determined by reduction of full height hn of embankment by height of layer of upper ground fill. The required thickness of compacted snow is determined by formula H = 0.0316T/ and value of decrease of ground temperature at depth of 10 m is determined by formula &Dgr;t= -52/T, where T is number of degree-months of positive temperatures in summer period: T=, where t1 is average monthly positive temperature of outdoor air; n i number of months with positive temperature in summer; hn is full height of embankment. EFFECT: provision of immediate decrease of temperature of base grounds with winter-spring construction of embankment with frozen ground. 2 dwg
机译:领域:建筑;可用于多年冻土地区的路堤施工。实质:方法包括在一年的春季期间,将岩石或粗糙颗粒的干燥冷冻地面填充到平台上,该平台上已清除积雪。计算出的压实雪或冰层位于填充的地面层上,并覆盖有一层干燥的冷冻地面。填土的高度取决于路堤的全高h n 减去上填土层的高度。压实雪的所需厚度由公式H = 0.0316T / <图像文件=“ 00000004.GIF” he =“ 6” id =“ imag0.4” imgContent =“ undefined” imgFormat =“ GIF” wi =“ 4 “ />和10 m深度处的地面温度下降值由公式&Dgr; t = -52 / T确定,其中T是夏季的正温度度数-月数:T = <图像文件=“ 00000005.GIF“ he =” 12“ id =” imag0.5“ imgContent =” undefined“ imgFormat =” GIF“ wi =” 10“ />,其中t 1 是室外空气n我在夏季中出现正温度的月份数; h n 是路堤的全高。效果:采用冻土路堤的冬春结构,可立即降低基础地温。 2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号