首页> 外国专利> METHOD OF COMPLETION OF WELL WITH FORMATION FLUID LEVEL BELOW TUBING SHOE UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES

METHOD OF COMPLETION OF WELL WITH FORMATION FLUID LEVEL BELOW TUBING SHOE UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES

机译:异常低地层压力条件下成层流体在输油管下的完井方法

摘要

FIELD: development of gas and gas-condensate fields at the final stage of well operation; may be used in completion of well with high stage of gas presence (300-500 m). SUBSTANCE: method includes injection into well of anionic or nonionic surfactant or their mixture in the amount sufficient for formation of stable foam of formation fluid. Well is closed and excessive pressure is built up at wellhead meeting the conditions specified in the invention description. Introduced into pipe space successively are gas-forming agent, for instance, ammonium carbonate and acid, for instance, 24-% hydrochloric acid solution in stoichiometric quantities. Annular space is communicated with high-pressure gas main line, and pipe space is connected with flare line up to ceasing of foam flowing out. Efficiency of removal of formation fluid from self-killing wells is increased due to water encroachment under conditions of abnormally low formation pressures (below 0.5 of hydrostatic pressure) when formation fluid level is below tubing shoe and tubings are above interval of perforation of producing formation. EFFECT: higher efficiency.
机译:领域:在气井运营的最后阶段开发天然气和凝析气田;可以用于高气藏阶段(300-500 m)的完井中。物质:该方法包括将足以形成稳定的地层泡沫的量的阴离子或非离子表面活性剂或其混合物注入井中。井被关闭,并且在井口处建立了满足本发明说明书中指定的条件的过大压力。依次将化学形成量的气体形成剂例如碳酸铵和酸例如24%盐酸溶液引入管道空间。环形空间与高压气体主管线连通,而管道空间与火炬线相连,以阻止泡沫流出。当地层液位低于油管靴且油管高于生产地层射孔间隔时,在异常低的地层压力(低于静水压的0.5)下,由于水的侵入,从自杀井中去除地层流体的效率提高。效果:更高的效率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号