首页> 外国专利> CABLE TRENCH BETWEEN BUILDINGS AND ITS CONSTRUCTION METHOD AND BLOCK STRUCTURE USED FOR THE CONSTRUCTION METHOD

CABLE TRENCH BETWEEN BUILDINGS AND ITS CONSTRUCTION METHOD AND BLOCK STRUCTURE USED FOR THE CONSTRUCTION METHOD

机译:建筑物之间的电缆沟及其施工方法以及用于该施工方法的砌块结构

摘要

PROBLEM TO BE SOLVED: To shorten the construction term of a plant having a cable trench between buildings by forwarding the initiation time of cable laying work in the cable trench between buildings. SOLUTION: Supports 4a and 4b and each of beams 1a and 1b are left in a set space 24 of a cable trench between buildings even after forming the upper concrete slab 6a, and by using the supports 4a and 4b as support means for the cable tray 5, the cable tray 5 is placed in the set space 14. Without waiting for the increase of the design strength of the upper concrete slab 6a, the cable is laid in the trench between building in this construction method.
机译:要解决的问题:通过提前在建筑物之间的电缆沟中铺设电缆的开始时间,来缩短建筑物之间具有电缆沟的工厂的建造期限。解决方案:即使在形成上部混凝土板6a之后,并通过使用支撑4a和4b作为电缆桥架的支撑装置,支撑4a和4b以及梁1a和1b的每一个仍留在建筑物之间的电缆沟的固定空间24中如图5所示,将电缆桥架5放置在设置空间14中。在不等待上部混凝土板6a的设计强度增加的情况下,以这种施工方法将电缆铺设在建筑物之间的沟槽中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号