TBM EXCAVATION PARALLEL PRECEDING BORING DEVICE AND PRECEDING BORING HOLE EXCAVATION METHOD

机译:TBM开挖平行先行掘进装置及先行掘进钻孔方法

摘要

PROBLEM TO BE SOLVED: To enable preceding boring in parallel with TBM excavation by circumferentially movably providing a boring machine on the annular auxiliary working frame travelling on another rail and forwardly obliquely excavating a hole. ;SOLUTION: After a body mount a belt conveyor 3 through a gripper 2 and a carriage traction beam 8, a tunnel boring machine(TBM) hauls a succeeding carriage T to be excavated. In no interference therewith, another rail is provided in the outside, a boring machine 5 is circumferentially movably disposed on an annular auxiliary working frame 4 running thereon, the boring machine 5 on the auxiliary working frame 4 is fixed regardless of excavation of TBM body, and a preceding boring hole is excavated in inclination not exceeding 30 m in front of cutting. Clearance of approximately 7.7 m had better exist in the range of movement of the auxiliary working frame 4. Thus, TBM excavation and preceding boring are performed in parallel, and high speed excavation is enabled in the estimation of earth quality in front of cutting.;COPYRIGHT: (C)1998,JPO
机译:解决的问题:通过在环形辅助工作架上沿圆周移动的方式在另一条导轨上行进并向前倾斜地开孔,来使钻孔工作与TBM开挖并行进行。 ;解决方案:在车身上通过抓具2和滑架牵引梁8安装皮带输送机3之后,隧道掘进机(TBM)牵引要挖掘的后续滑架T。在不产生干扰的情况下,在外部设置了另一条导轨,镗床5沿圆周可移动地布置在其上运行的环形辅助工作架4上,无论TBM主体的开挖如何,镗孔机5都固定在辅助工作架4上,在切割前,先开一个不超过30 m的钻孔。在辅助工作架4的运动范围内,最好有大约7.7 m的空隙。因此,TBM开挖和先前的镗孔是并行进行的,并且可以进行高速开挖,从而估算出切割前的土壤质量。版权:(C)1998,JPO

著录项

  • 公开/公告号JPH10311198A

    专利类型

  • 公开/公告日1998-11-24

    原文格式PDF

  • 申请/专利权人 KAJIMA CORP;

    申请/专利号JP19970123779

  • 申请日1997-05-14

  • 分类号E21D9/10;

  • 国家 JP

  • 入库时间 2022-08-22 02:33:06