首页> 外国专利> Largest cofferdam pressure of geothermal winze and forecasting modulo null of the highest

Largest cofferdam pressure of geothermal winze and forecasting modulo null of the highest

机译:地热冻结的最大围堰压力和最高模零的预报。

摘要

PURPOSE: To predict a maximum shut-off pressure and a maximum temperature of a geothermal pile well. ;CONSTITUTION: The length of a liquid phase 6 in a geothermal pile well 1 is calculated from a pressure acting upon the geothermal pile well 1 and the specific weight of geothermal fluid flowing into the geothermal well 1. Further, it is calculated from the depth of a feed pump in the well 1, the density and specific enthalpy of the geothermal. Further, the inflow temperature of the geothermal fluid at which the thus calculated lengths of the liquid phase concede with each other, is obtained, and the pressure in the pile well 1 at that temperature is calculated.;COPYRIGHT: (C)1993,JPO&Japio
机译:目的:预测地热桩井的最大关闭压力和最高温度。 ;组成:地热桩井1中液相6的长度是根据作用于地热桩井1的压力和流入地热井1的地热流体的比重计算得出的。此外,还应根据深度计算得出井1中的进料泵的数量,地热的密度和比焓。进而,求出由此求得的液相的长度一致的地热流体的流入温度,并计算出该温度下的桩井1内的压力。(COPYRIGHT:(C)1993,JPO&Japio)

著录项

  • 公开/公告号JP2956284B2

    专利类型

  • 公开/公告日1999-10-04

    原文格式PDF

  • 申请/专利权人 MITSUBISHI MATERIARU KK;

    申请/专利号JP19910164719

  • 发明设计人 KUBOTA YASUHIRO;KITAO KOJI;

    申请日1991-07-04

  • 分类号E21B47/06;E21B43/00;

  • 国家 JP

  • 入库时间 2022-08-22 02:31:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号