The large section excavation construction method null by the pipe

机译:大断面开挖施工方法无效

摘要

PROBLEM TO BE SOLVED: To ensure safety and reduce the construction cost by arranging long face bolts taking fiber reinforced plastic cable bolt as a core material at suitable intervals in the working face in the interior surrounded with a pipe loop constructed extending over the total length of a start vertical shaft and an arrival shaft, and digging while breaking the bolts. ;SOLUTION: A boring machine 4 is installed on the start vertical shaft 2 side, and a steel pipe 5 is propelled extending the total length from the start vertical shaft 2 to an arrival shaft 3 to construct a pipe roof 6. Subsequently in the interior surrounded with the pipe roof 6, long face bolts 12 having a core material of a fiber reinforced plastic cable bolt having such a length as to extend over the total length of the start vertical shaft 2 and the arrival shaft 3 are arranged at suitable spaces from the working surface parallel to each other. Drilling is started from the start vertical shaft 2, and with the advance of drilling, a timbering is assembled, an intermediate working floor is installed in the middle stage by use of an H-steel and a lining plate, and drilling is performed while the long face bolts 12 are broken by an excavator such as a back hoe or the like on the intermediate working floor.;COPYRIGHT: (C)1999,JPO
机译:解决的问题:为确保安全并降低施工成本,通过以纤维增强塑料电缆螺栓为核心材料的长端面螺栓在内部工作面中以适当的间隔布置,并在整个长度范围内构造一个管道环。启动垂直轴和到达轴,并在破坏螺栓的同时进行挖掘。 ;解决方案:将镗床4安装在起始竖井2侧,并推动一根钢管5,将全长从起始竖井2延伸到到达竖井3,以构成管顶6。长管螺栓12被管顶棚6所包围,该长管螺栓12具有纤维增强塑料电缆螺栓的芯材,该螺栓具有在起始竖井轴2和到达竖井轴3的总长度上延伸的长度。工作面彼此平行。从垂直竖井2开始进行钻孔,随着钻孔的进行,组装了伐木机,在中间阶段使用H型钢和衬板安装了中间工作台,并在钻孔过程中进行钻孔。长头螺栓12被挖掘机(例如挖土机等)在中间工作地板上破坏。;版权所有:(C)1999,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号