首页> 外国专利> Method for laying electrical cables from a first offshore wind power plant to a second offshore wind power plant

Method for laying electrical cables from a first offshore wind power plant to a second offshore wind power plant

机译:从第一海上风力发电厂到第二海上风力发电厂铺设电缆的方法

摘要

A method for laying electrical cables from a first offshore wind power plant to a second offshore wind power plant. The method comprises placing the cable to be laid in the tower or the foundation of the first offshore wind power plant before the plant is erected, erection of the first offshore wind power plant, taking a tow line from one wind power plant to the other wind power plant, and drawing the leading end of the cable from the first wind power plant to the second wind power plant while releasing the cable from the tower or the foundation component of the first wind power plant.
机译:一种用于铺设从第一海上风力发电厂到第二海上风力发电厂的电缆的方法。该方法包括:将待铺设的电缆在工厂竖立之前放置在第一海上风力发电厂的塔架或基础中;第一海上风力发电厂的架设;从一个风力发电厂到另一风力的拖缆线电缆,并将电缆的前端从第一风力发电厂拉到第二风力发电厂,同时从第一风力发电厂的塔架或基础组件释放电缆。

著录项

  • 公开/公告号AU3030800A

    专利类型

  • 公开/公告日2000-07-31

    原文格式PDF

  • 申请/专利权人 AERODYN ENGINEERING GMBH;

    申请/专利号AU3030800

  • 发明设计人 SONKE SIEGFRIEDSEN;

    申请日1999-12-10

  • 分类号H02G1/10;F03D11/04;

  • 国家 AU

  • 入库时间 2022-08-22 01:52:01