首页> 外国专利> A method and prefabricated tiers installation block to the arrangement in a or as a supply shaft of the case of new

A method and prefabricated tiers installation block to the arrangement in a or as a supply shaft of the case of new

机译:一种方法和预制层安装块,用于在新的情况下将其布置在供应轴中或作为供应轴

摘要

The present invention relates to a method for the integration of prefabricated, ready-to-install tiers installation blocks in or as a supply channels of new buildings, in particular projectile residential buildings, rows of buildings, individual houses, hotel -, an office -, trade - and industrial buildings, wherein the blocks to each other by means of solder placed on top of each other and are vertically aligned, wherein the support frame of each block passes through the ceiling of the respective stage and in the space above it projects slightly. The present invention also relates to a prefabricated tiers installation block to be arranged in the aforementioned supply shafts. Dollars a of the invention it is the object of the installation of the prefabricated, ready-to-install installation blocks time - and economically in the body-in-white of course, in particular in the production of floors and ceilings, to integrate progressively starting. Dollars a this object is achieved essentially in that the levels installation blocks as a the ceiling structure leading measurement - and formwork column with previously measured meters crack is mounted.
机译:本发明涉及一种用于将预制的,准备安装的层的安装块集成到新建筑物中,或作为新建筑物的供应通道的方法,所述新建筑物特别是弹射性居民建筑物,建筑物的排,个人房屋,旅馆,办公室- ,工业和工业建筑,其中砖块通过放置在彼此顶部的焊料彼此垂直对齐,其中每个砖块的支撑框架穿过相应平台的天花板并在其上方的空间中突出略。本发明还涉及一种要布置在上述供应井中的预制层安装块。发明内容本发明的目的是,预制的,准备安装的安装的安装逐步地,并且经济地以白车身,特别是在地板和天花板的生产中,逐步地集成在一起。开始。美元这个目的的实质是通过将水平安装块作为引导测量的天花板结构而实现的,并且安装了具有先前测量的仪表裂缝的模板柱。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号