首页>
外国专利>
A method and prefabricated tiers installation block to the arrangement in a or as a supply shaft of the case of new
A method and prefabricated tiers installation block to the arrangement in a or as a supply shaft of the case of new
展开▼
机译:一种方法和预制层安装块,用于在新的情况下将其布置在供应轴中或作为供应轴
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method for the integration of prefabricated, ready-to-install tiers installation blocks in or as a supply channels of new buildings, in particular projectile residential buildings, rows of buildings, individual houses, hotel -, an office -, trade - and industrial buildings, wherein the blocks to each other by means of solder placed on top of each other and are vertically aligned, wherein the support frame of each block passes through the ceiling of the respective stage and in the space above it projects slightly. The present invention also relates to a prefabricated tiers installation block to be arranged in the aforementioned supply shafts. Dollars a of the invention it is the object of the installation of the prefabricated, ready-to-install installation blocks time - and economically in the body-in-white of course, in particular in the production of floors and ceilings, to integrate progressively starting. Dollars a this object is achieved essentially in that the levels installation blocks as a the ceiling structure leading measurement - and formwork column with previously measured meters crack is mounted.
展开▼