首页> 外国专利> Process for determination of the earlier forces acting on an area or mountain or earth prior to boring of a tunnel or similar

Process for determination of the earlier forces acting on an area or mountain or earth prior to boring of a tunnel or similar

机译:确定在掘进隧道或类似物之前作用在区域,山脉或地球上的早期力的过程

摘要

The invention relates to a method for determining a previous state of stress in the area of a mountain range or soil. Said method comprises the following steps: applying a reference bit for a radial position, excavating a tunnel section, introducing a radially effective support in the area of the reference bit, determining the force acting upon said support and/or determining the dimensions of the support, and determining the previous state of stress using the detected force and/or dimensions of the support. The method for determining parts of a line that is characteristic of a mountain range comprises the following steps: introducing gradually variable, radially effective safety devices, allowing the support introduced to be deformed by geometrical changes, determining the force acting upon said support and determining the course and/or a parameter of the line characteristic of the mountain range on the basis of the detected force and/or the changed dimensions of the support. The values obtained are used in tunneling methods and systems.
机译:本发明涉及一种用于确定山脉或土壤区域中的先前应力状态的方法。所述方法包括以下步骤:将参考钻头用于径向位置,挖掘隧道截面,在参考钻头的区域中引入径向有效的支撑,确定作用在所述支撑上的力和/或确定支撑的尺寸。 ,并使用检测到的力和/或支撑尺寸确定先前的应力状态。确定山脉特征的线路部分的方法包括以下步骤:引入逐渐可变的,径向有效的安全装置,允许所引入的支撑通过几何变化而变形,确定作用在所述支撑上的力,并确定路线和/或山脉的线特征的参数基于所检测到的力和/或支撑件的变化尺寸。获得的值用于隧道方法和系统。

著录项

  • 公开/公告号DE19914973A1

    专利类型

  • 公开/公告日1999-11-18

    原文格式PDF

  • 申请/专利权人 TACHUS GMBH;

    申请/专利号DE1999114973

  • 发明设计人 HAGEDORN THIEMO;

    申请日1999-04-01

  • 分类号E21B47/06;G01L1/00;

  • 国家 DE

  • 入库时间 2022-08-22 01:42:10

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号