首页> 外国专利> CONSTRUCTION METHOD FOR ISOLATION LAYER IN TUNNEL SECONDARY LINING

CONSTRUCTION METHOD FOR ISOLATION LAYER IN TUNNEL SECONDARY LINING

机译:隧道二次衬砌隔离层的施工方法

摘要

PROBLEM TO BE SOLVED: To further reduce the force of constraint to the secondary lining of a primary support to prevent the cracking of secondary lining concrete.;SOLUTION: Isolation layers 10 and 12 consisting of elastic bodies 30-50 mm thick are formed on the placing surface for secondary lining concrete 5 of the primary support consisting of a steel support 1 and shotcrete 2, and the secondary lining concrete 5 is thereafter placed on the isolation layers 10 and 12.;COPYRIGHT: (C)2001,JPO
机译:解决的问题:为了进一步减小对主要支撑物的次要衬砌的约束力,以防止次要衬砌混凝土破裂。解决方案:解决方案:在隔离层10和12上形成30至50 mm厚的弹性体由钢支架1和喷射混凝土2组成的主支架的辅助衬砌混凝土5的放置表面,然后将辅助衬砌混凝土5放置在隔离层10和12上;版权所有:(C)2001,JPO

著录项

  • 公开/公告号JP2001262987A

    专利类型

  • 公开/公告日2001-09-26

    原文格式PDF

  • 申请/专利权人 OHBAYASHI CORP;

    申请/专利号JP20000370361

  • 申请日2000-12-05

  • 分类号E21D11/10;

  • 国家 JP

  • 入库时间 2022-08-22 01:31:41

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号