首页>
外国专利>
Integrated excavation shoring building foundation method
Integrated excavation shoring building foundation method
展开▼
机译:综合开挖支护建筑基础方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A integrated scheduling method for installing modified precast building columns, first floor grade slab and supporting beams prior to site excavation, and to use these components, together with specialized shoring panels and/or modified exterior wall panels, which are installed simultaneously with the excavation, and together with underground floor structures and beams, as a shoring system during excavation. The shoring or wall panels are forced downwardly to support the excavation sides as excavation proceeds downwards, avoiding the necessity of a conventional shoring system.
展开▼