首页>
外国专利>
Dead water manner and the dead water feature null in the foundation pile hole for ground strengthening
Dead water manner and the dead water feature null in the foundation pile hole for ground strengthening
展开▼
机译:桩基孔中的死水方式和死水特征无效
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: To effectively cut-off water to a foundation pile hole and efficiently perform construction of the foundation pile by scattering water absorptive polymer granule on the foot protective supporting layer in the neighborhood of a pile hole bottom part so as to prevent water leakage to the foot protection layer. ;CONSTITUTION: When drilling of a foundation pile hole by means of an excavation 1 is completed, fine granule of water absorptive polymer 4 mixed with foot protective liquid is injected into a supporting layer 3. The foot protective liquid 5 is injected before swelling of the polymer 4. Next while drawing up a shaft 12, a decided quantity of pile circumference fixing liquid 6 is poured in so as to enclose the foot protective liquid 5 in the pile circumference fixing liquid 6. Next, a foundation pile 32 is driven to a decided position while rotating in the pile circumference fixing liquid 6 and foot protective liquid 5 by means of a pile driver 36, and hence the foot protective liquid 5 and the pile circumference fixing liquid 6 are forced up around the foundation pile 32 by the volume of the foundation pile 32 so as to fix the pile 32.;COPYRIGHT: (C)1994,JPO
展开▼