首页> 外国专利> Prefabricated construction method and piers for concrete block piers

Prefabricated construction method and piers for concrete block piers

机译:预制砌块墩的施工方法及墩

摘要

PURPOSE: To shorten construction period of a RC bridge pier and reduce construction cost. ;CONSTITUTION: A part which constitutes a post is standardized with concrete block cement 211 and 212 and reinforcing bar cages 22 and 23 in its construction method. Each stage of bridge pier concrete blocks 21 are connected with segment bolts 213, thereby constituting each concrete block 21. The reinforcing bar cages are inserted into the segments and welded with a structural steel 11 of a foundation 1 and added up. Concrete 20 is cast thereinto and stacked one after another, thereby building up a post 2 on the foundation 1.;COPYRIGHT: (C)1994,JPO&Japio
机译:目的:缩短钢筋混凝土桥墩的工期,降低施工成本。 ;组成:构成立柱的零件在其建造方法中用混凝土砌块水泥211和212以及钢筋笼22和23标准化。桥墩混凝土砌块21的各个阶段用分段螺栓213连接,从而构成每个混凝土砌块21。将钢筋笼插入分段中,并与基础1的结构钢11焊接并加在一起。将混凝土20浇铸到其中并逐一堆叠,从而在地基1上建造桩2。版权所有:(C)1994,JPO&Japio

著录项

  • 公开/公告号JP3322701B2

    专利类型

  • 公开/公告日2002-09-09

    原文格式PDF

  • 申请/专利权人 ケイコン株式会社;

    申请/专利号JP19920293932

  • 发明设计人 畑 実;福住 隆二;

    申请日1992-10-08

  • 分类号E01D19/02;

  • 国家 JP

  • 入库时间 2022-08-22 01:00:24

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号