首页> 外国专利> Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam, and constructing method of fabricated reinforced concrete pier using the unit pier block

Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam, and constructing method of fabricated reinforced concrete pier using the unit pier block

机译:使用预应力混凝土钢丝组件和H型梁的钢筋混凝土单元墩块,以及使用该单元墩块建造钢筋混凝土墩的方法

摘要

Prefabricated reinforced concrete pier construction method, of a plurality upper surface when forms a concave portion to be in the H beam inserted into the convex portion forming cross-section H-beam with the invention reinforced concrete units pier block using the PC strand assembly and the H-beam according to and it was created by installing the installation, obtain and install, install assemble reinforcement along the old PC strand installation of the outer principal surface to a plurality of PC strand installation sphere be the PC strand assembly inserted in the outer principal surface of the center and the end surface, and placing the curing of concrete and reinforced concrete unit blocks and pier; Embedded install support into the pier foundation of concrete, and that over a plurality of stud bolts to install the H beams installed over the H-beam front welding and installation H beam after install the PC strand anchorage fixing the PC strand for PC strand assembly sphere and PC strand installation sphere with the reinforcement to the concrete unit inserting the H-beam and the PC strand assembly of the pier block arranged to add location projections of the RC unit pier block the pier foundation concrete upper subjected to grouting the H beams installed obtain installed and the connecting portion, the sealing after the installation is formed by repeatedly laminating the process of injecting the epoxy pier pillars and; By installing insert coping block bottom with a concave portion connected to the insertion block, the old PC strand installation sphere H-beam installation formed in seeing portions of the pier pole RC unit pier blocks of the top of the coping block so that copings block bottom and the recess is in close contact connection relates to the construction, prefabricated reinforced concrete pier while tension the PC strand after mounting to the upper reinforced concrete units pier block fixing the PC strand for PC strand anchorage is installed in the groove of the upper coping blocks and installed by grouting filled in coping block upper groove .
机译:预制钢筋混凝土墩的施工方法,利用本发明的钢筋混凝土单元墩块,利用PC绞线组件和多个构件,在多个上表面形成凹部时在插入到形成截面H梁的凸部的H梁中形成凹部。根据它的H型钢通过安装安装来创建,获取并安装,沿着旧的PC钢绞线安装件的外主表面将装配钢筋安装到多个PC钢绞线安装球上,即将PC钢绞线组件插入到外部主筋中中心和端面的表面,并放置混凝土和钢筋混凝土单元块和墩的养护;将嵌入式安装支架嵌入混凝土的墩基中,并通过多个双头螺栓将H形梁安装在H型钢前部焊接上方,并在安装PC股锚固件之后将H形梁固定在PC股的装配领域中和PC股安装球体,在混凝土单元中加筋,插入H型梁,桥墩块的PC股组件布置成增加RC单元墩块的位置投影,对经过灌浆的H梁进行灌浆的墩基混凝土上部安装和连接部分,安装后的密封是通过重复层压环氧树脂墩柱的注入过程而形成的;以及通过将插入处理模块的底部安装有连接到插入模块的凹入部分,可以在处理模块顶部的墩杆RC单元的缓冲模块的可视部分中形成旧的PC钢绞线安装球H型梁安装,从而使处理模块底部且凹槽与建筑物紧密接触,与预制钢筋混凝土墩连接,同时在将PC绞线安装到上部钢筋混凝土单元后,将PC绞线张紧,将用于锚固PC绞线的PC绞线安装在上部应对块的凹槽中并通过灌浆填充到应对块的上部凹槽中。

著录项

  • 公开/公告号KR100499977B1

    专利类型

  • 公开/公告日2005-07-07

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20020065298

  • 发明设计人 노윤근;박근화;

    申请日2002-10-24

  • 分类号E01D19/02;

  • 国家 KR

  • 入库时间 2022-08-21 22:03:39

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号