首页> 外国专利> PRESSURE WAVE REDUCING CONSTRUCTION IN TUNNEL AND PRESSURE WAVE REDUCING METHOD IN TUNNEL

PRESSURE WAVE REDUCING CONSTRUCTION IN TUNNEL AND PRESSURE WAVE REDUCING METHOD IN TUNNEL

机译:隧道压力波降压构造及隧道压力波降压方法

摘要

PROBLEM TO BE SOLVED: To provide a pressure wave reducing construction in tunnel and a pressure wave reducing method in tunnel capable of reducing a micropressure wave and rush wave at the mouth of tunnel or the like during the rushing of a train.;SOLUTION: At a lateral cross section vertical to a tunnel center line 81a extending in parallel to the extending direction of a double truck type tunnel 81 where the overall cross section in the extending direction of a micropressure wave reducing structure 10 or the like, the location of the center line 10c of the micropressure wave reducing structure 10 is aligned with a horizontal projected position of the center line 84a of a running train 84 which is rushing in.;COPYRIGHT: (C)2002,JPO
机译:要解决的问题:提供一种在隧道中减小压力波的结构和在隧道中减小压力波的方法,该方法能够在火车冲动时减小隧道口等处的微压力波和冲击波。垂直于平行于双卡车型隧道81的延伸方向延伸的隧道中心线81a的横截面,其中沿微压波减小结构10等的延伸方向的整个横截面,中心的位置微压波减小结构10的直线10c与正在驶入的行驶列车84的中心线84a的水平投影位置对齐。版权所有:(C)2002,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号