首页> 外国专利> Covering works wall orbicular supporting structure null for tunnel application

Covering works wall orbicular supporting structure null for tunnel application

机译:隧道工程的覆盖工程墙球形支撑结构无效

摘要

PURPOSE:To keep the circle of a tunnel without reduction of construction efficiency of the tunnel. CONSTITUTION:Two sets of device units 13 provided with a circular body 11 arranged along the inner wall face of a tunnel, and rotary rings 12 which are attached to the upper and lower parts of the circular body 11 and freely rotated around the tangential axial line of the circular body 11 and also freely positioned to contact the inner wall face of the tunnel, are adjacently installed in the axial direction of the tunnel. This pair of device units 13, 13 are connected to each other at the upper and lower parts by connecting members 14. Ropes 20 are fixed to be attracted by a shielding excavator.
机译:目的:在不降低隧道施工效率的前提下,保持隧道的圆周。组成:两组设备单元13,分别具有沿隧道内壁面布置的圆形体11和旋转环12,旋转环12分别安装在圆形体11的上部和下部,并围绕切线轴线自由旋转圆形主体11的“圆角”也自由地定位成与隧道的内壁面接触,在隧道的轴向方向上相邻地安装。该对装置单元13、13通过连接构件14在上部和下部彼此连接。绳索20被固定以被防护挖掘机吸引。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号