首页> 外国专利> Tunnel support trail section additional strength manner

Tunnel support trail section additional strength manner

机译:隧道支护道段附加强度方式

摘要

PURPOSE: To improve workability by mounting an auger to the boom of a running base machine through a leader, connecting a down-the-hole-hammer received in a casing steel pipe to the auger, and inserting the steel pipe into the natural ground while drilling with the hammer. CONSTITUTION: The boom 2 of a backhoe 1 is operated so as to move the lower end of a leader 12 up to the leg part of a steel support 5. Next, the built-in hole 9 of a casing steel pipe P is drilled by means of a diameter spreading bit 21 on the lower end of a down-the-hole-hammer main body 20. In this case, the bit 21 efficiently drills by a hit by compressed air of an auger speed reducer 40, rotation of the speed reducer 40, and pushing action by a feed motor 15 provided on the leader 12. After pressing the pipe P in the hole 9 keeping pace with drilling, the interior of the pipe P and the gap outside the pipe P are filled with quick hardening grout, and after hardening, it exhibits fixed strength as a supporting pile 50. Hereby, the support is prevented from sinking or the like, and can be executed safely and quickly.
机译:目的:通过将钻头通过导向器安装到正在运行的基础机的动臂上,将套管式钢管中容纳的潜孔锤连接到钻头,并将钢管插入自然地面,以提高可加工性用锤子钻孔。构成:挖土机1的起重臂2操作成将引导件12的下端移至钢支架5的支腿部分。接下来,通过以下方式钻出套管P的内置孔9:在潜孔锤主体20的下端具有扩径钻头21的装置。在这种情况下,钻头21通过螺旋钻减速器40的压缩空气的撞击而有效地钻出,转速减速器40,并通过设置在引导件12上的进给电机15进行推动作用。在将管子P压入与钻孔保持同步的孔9中之后,管子P的内部和管子P外部的间隙被快速硬化的水泥浆填充。 ,并且在硬化之后,其表现出作为支撑桩50的固定强度。由此,防止了支撑下沉等,并且可以安全,快速地进行支撑。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号