首页> 外国专利> EQUIPMENT FOR COMBUSTION COMPLETION IN WASTE INCINERATOR

EQUIPMENT FOR COMBUSTION COMPLETION IN WASTE INCINERATOR

机译:垃圾焚烧炉燃烧完成设备

摘要

PROBLEM TO BE SOLVED: To provide equipment for combustion completion in which ember of incineration ash discharged from the incinerator is completely burned, clinker is prevented from becoming massive, discharge of incineration ash is facilitated, and burnout of parts is prevented.;SOLUTION: Main ember-burning is accelerated by supplying main combustion air M to a step brick 1, draft holes 21, 32, and 51 for supplying combustion air H and cooling fins 22, 36, and 52 are provided respectively to an inclined hearth board 2, a reversed fire-grate 3, and a protection board 5 to prevent burnout and deterioration of essential parts. Falling-off of combustion ash A by its own weight is surely prevented by setting a gap G between the tip end 27 of the board 2 and the tip end 38 of the grate 3 to 200-250 mm. A clinker crusher 23 is allowed to automatically advance/retreat to prevent the clinker from becoming massive.;COPYRIGHT: (C)2001,JPO
机译:解决的问题:提供一种燃烧完成的设备,其中焚化炉排出的焚烧灰烬完全燃烧,防止熟料结块,促进焚烧灰分排放,并防止零件烧坏。通过将主燃烧空气M供应至台阶砖1来加速灰烬燃烧,用于供应燃烧空气H的通风孔21、32和51以及冷却翅片22、36和52分别设置至倾斜的炉床板2,倒置炉排3和保护板5,以防止烧毁和损坏主要部件。通过将板2的末端27与炉rate3的末端38之间的间隙G设置为200-250mm,可以可靠地防止燃烧灰A因其自重而掉落。允许熟料破碎机23自动进退,以防止熟料变大。版权所有:(C)2001,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号