首页> 外国专利> Process for operating a waste water treatment plant and a clarified water extractor pump for carrying out the process

Process for operating a waste water treatment plant and a clarified water extractor pump for carrying out the process

机译:操作废水处理厂的方法和用于执行该方法的净化水抽水泵

摘要

A method for operating a wastewater treatment plant, in particular a single-tank wastewater treatment plant, in which a settling and secondary clarification phase takes place after an activation phase, comprises a clear water extraction pump for removing the clear water after the settling and secondary clarification phase. The clear water extraction pump is switched on at least for a short pump surge, in particular during the settling and secondary clarification phase, so that the pump pumps water into a rising section of a pressure line connected to the pressure side of the pump, which after the pump surge through the pump into the tank of the plant running back. IMAGE
机译:一种用于操作废水处理厂,特别是单罐废水处理厂的方法,其中在活化阶段之后进行沉降和二级澄清阶段,该方法包括清水抽水泵,用于在沉降和二级之后去除清水。澄清阶段。至少在短暂的泵喘振期间,特别是在沉降和二次澄清阶段,接通清水抽水泵,以便泵将水泵入连接到泵压力侧的压力管线的上升段中。泵激增后,通过泵进入运行中的工厂的储罐。 <图像>

著录项

  • 公开/公告号EP1213265A1

    专利类型

  • 公开/公告日2002-06-12

    原文格式PDF

  • 申请/专利权人 BAUMANN MARKUS;

    申请/专利号EP20010126873

  • 发明设计人 BAUMANN MARKUS;

    申请日2001-11-12

  • 分类号C02F3/12;

  • 国家 EP

  • 入库时间 2022-08-22 00:33:11

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号