Aquifer base propulsion method of constructionKY-3 pipejacking and propulsion method and devices that use simplicity freezing propulsion method of construction
Aquifer base propulsion method of constructionKY-3 pipejacking and propulsion method and devices that use simplicity freezing propulsion method of construction
展开▼
机译:施工含水层基础推进方法-3顶管推进方法及采用简易冻结施工方法的装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A simple freezing steel pipe jacking method is provided to restrain the additional required costs for a jacking work, to obtain the maximum freezing effects of the ground in a short time and to prevent an accident caused by an oxygen deficiency in a face. CONSTITUTION: The simple freezing steel pipe jacking method comprises the steps of: after completing a jacking work in the daytime, a pre-jacking a simple freezing steel pipe(1) into the depth of 3 meters; settling and cutting off the ground of an aquifer by freezing the ground around the simple freezing steel pipe(1) for 12 hours at night by interposing dry ice into a dry ice cartridge; absorbing carbon dioxide caused by deicing dry ice by a carbon dioxide absorber through a connection pipe to prevent a labor accident caused by an environmental oxygen deficiency in a face; and excavating the 3-meter frozen earth and jacking a thrust head pipe(C) into the depth of 3 meters using a hydraulic jack(23).
展开▼