首页> 外国专利> PRESTRESSED COMPOSITE BEAM CARRIED IN ENTIRE COMPOSITION BY UNIFICATION OF LOWER CASING CONCRETE AND REINFORCEMENT OR STEEL WIRE

PRESTRESSED COMPOSITE BEAM CARRIED IN ENTIRE COMPOSITION BY UNIFICATION OF LOWER CASING CONCRETE AND REINFORCEMENT OR STEEL WIRE

机译:通过统一下部套管混凝土和钢筋或钢线承载的完整组合形式的预应力复合梁

摘要

The present invention is to pre-tension the reinforcement or steel wire 30 is placed in the lower casing concrete 20 before the restoration of the steel in the tension state by restoring the steel or steel wire due to the release load of the lower casing concrete 20 due to the release load It does not resist the introduction so as not to affect the compressive force introduced into the concrete, and in the critical state in which the stress of the lower casing concrete 20 changes from compression to tension when the working load is applied, the rebar or steel wire 30 installed in the longitudinal direction is In order to be placed in a state of tensile resistance to achieve a full composite action of the concrete and the reinforcement or steel wire (30). In other words, to minimize the compressive force loss of the prestressed concrete beam during the release process during tensioning the rebar or steel wire (30) to maximize the efficiency of the compressive stress introduced into the concrete, the hypothesis is used after the completion of the prestressed girders The purpose is to obtain effective cross-sectional behavior that induces resistance to tensile forces occurring under load.
机译:本发明是在由于下部套管混凝土20的释放载荷而使钢或钢丝复原之前,在将钢或钢丝恢复到张紧状态之前,将钢筋或钢丝30预拉伸到下部套管混凝土20中。由于释放载荷,在施加工作载荷时,下套管混凝土20的应力从压缩变为拉紧的临界状态下,它不抵抗引入,从而不影响引入混凝土中的压缩力。沿纵向方向安装的钢筋或钢丝30为处于抗拉状态,以实现混凝土和钢筋或钢丝(30)的完全复合作用。换句话说,为了最小化在张紧钢筋或钢丝(30)的释放过程中预应力混凝土梁的压缩力损失,以最大程度地提高引入混凝土的压缩应力的效率,该假设是在混凝土完成后使用的。预应力大梁的目的是获得有效的截面性能,从而引起对载荷作用下产生的拉力的抵抗力。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号