首页> 外国专利> Site rail track post-subsidence renewal involves empty pipes or rods filled with or made of easily removable material and run through where plate and layer join.

Site rail track post-subsidence renewal involves empty pipes or rods filled with or made of easily removable material and run through where plate and layer join.

机译:工地轨道下沉后更新涉及填充或由易于移动的材料制成的空管或空棒,并贯穿板和层的连接处。

摘要

Empty pipes (5) are run through left to right directly above the hydraulically bound loadbearing layer (2) and the bearing plate (1) where they join. The pipes are filled with empty removable material or the pipes are replaced by rods of easily removed material. The pipes or rods are of greater diameter than the cable saws but less than 5 cm. Pipes or rods are set 2-20 m apart and in addition to the rail chairs the plate is fitted out with internally threaded inserts (7) which pass through the plate vertically from top to bottom. Saws are threaded through the embankment at the passage formed by the pipe etc so as to part plate from the bearing layer. The plate is then raised to datum level and fresh pipes or rods installed for the next renewal operation etc. The interval between plate and layer is packed with self setting material.
机译:空管(5)从左至右穿过液压约束的承重层(2)和连接其的轴承板(1)的正上方。管道中装满了可移动的空物料,或者用易于清除的物料棒代替了管道。管道或杆的直径大于电缆锯的直径,但小于5厘米。管道或杆的间距为2-20 m,除了轨道椅子外,该板还配有内螺纹插件(7),该插件从上到下垂直穿过板。锯子穿过由管道等形成的通道处的路堤,从而从支承层上分开。然后将板提升至基准水平,并安装新的管子或杆以进行下一次更新操作等。板和层之间的间隔填充有自凝材料。

著录项

  • 公开/公告号DE10110634A1

    专利类型

  • 公开/公告日2002-09-19

    原文格式PDF

  • 申请/专利权人 ED. ZUEBLIN AG;

    申请/专利号DE2001110634

  • 发明设计人 WIDMANN HORST;

    申请日2001-03-06

  • 分类号E01B37/00;E01B19/00;E01C23/00;

  • 国家 DE

  • 入库时间 2022-08-22 00:27:04

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号